Select GC Projects
GC experience is a key aspect of Meerkat’s advantage over other owner’s representative companies who have solely development backgrounds.
PROJECTS
-
Heavy structural renovation to add new floors, new MEP infrastructure, new finishes for Chick-Fil-A’s largest location in the US.
-
Approximately 200 unit rental to condo gut renovation conversion.
-
Approximately 50 unit rental to condo gut renovation conversion.
-
Approximately 500 unit ADA upgrade and finish upgrade renovation.
-
Renovated multiple historic townhouses being used for student housing.
-
Traditional in-line retail project for Italian lingerie brand.
-
Traditional in-line retail project for Italian high fashion brand. Coordinated high value and highly custom millwork inserts for merchandising.
-
Academic department gut renovation and re-demising of walls/spaces throughout. New MEP and AV/IT systems installed.
-
Constructed Allegro Coffee in an existing storage area connected to Whole Foods Market; conducted a long term phased renovation within Whole Foods Market including temporary protections, store management relations, and controlled environment construction.
-
Gray box interior construction project for fitness center.
-
Installed gym and cycling studio in new development at Santana Row in the south Bay Area.
-
Major construction project consisting of new electrical service, new elevator shaft with pile foundation, new sprinkler system, new plumbing supply and waste risers, and high end lobby finishes throughout.
-
10,000sf office renovation inclusive of high end millwork, storefront installations, intricate ductwork/HVAC system, and imported tile/furniture.
-
Meerkat Development has had their hands in many other construction projects; the above is merely a selection of specific works. For more information on any of the above projects, reach out to us, and we’d be happy to chat.
Pratt Townhouses / Brooklyn, NY
With projects completed in multiple verticals/sectors, and millions of dollars in budgets managed, we have the acumen and knowledge to immediately understand the status of a project, what a realistic timeline looks like to complete it, whether or not a change order is valid, and have an uncanny ability to “read between the lines” on GC reporting to ensure it’s accurate.
This way, owners and operators can plan opening dates with confidence.
Chick - Fill - A / New York, NY
Blink Fitness / Nutley, NJ
Brunello Cucinelli / Short Hills, NJ
10-27 46th Ave. / New York, NY
Intimissimi / Bethesda, MD
MiMa / New York, NY